ID: 2007.03.17.015 Test riveting before the final rivetting of the port side enginr room doorstep.
The test riveting was done by Erik Markussen and Theis Smith.
Description: ID: 2007.03.17.015 Test riveting before the final rivetting of the port side enginr room doorstep.
The test riveting was done by Erik Markussen and Theis Smith.